Eilean Dhiura - Drydocking 2025
Job Description:
Remove front ramps at pier, prep cradles, slip wash & stage vessel, full paint, remove PTO clutches & fabricate new mountings, fit & line clutches and pump, modify pipework, fit new fire pump to port main engine, machine crank shaft damper to pulley to suit B section belting, fabricate new mounting & pipework, modify & fit belt tensioners, fabricate & fit mountings for new alternator drive system, fit new heat exchanger to heating system, strip & overhaul all valves in pipework in engine room including sea inlets and discharges, drain & clean main engine fuel tanks, dispose of fuel, fabricate & fit new clutches & belts, repair pipework to flybridge steering, renew steering ram, bleed & test steering, repair leaking pipework to steering system in steering locker, scrape & clean x2 void spaces, descale & paint with 262 & 990, clean engine room bilge & steering locker bilge, replace all hydraulic rams on main ramp, stern ramp & locking ramps, fit new hydraulic hoses to rams & deck control valves, weld up cracks in stern ramp, gouge out & weld up cracks in fwd ramps, fit wear plates to ramp hinge covers, cut away fwd plate & framework for mounting lugs & finger flaps, cut shape & fit plates, bore fabricate & fit in mounting lugs for finger flaps, fit top hats to sleeves & bushes, drill thread & fit grease nipples to hinge points, refit ramps & finger flaps to boat, fabricate new bracket for magic eye sensors for lock rams, repair wheelhouse door, repair mast stay, remove old life raft & refit new, repair section of deck coating, strip out accommodation space, completely reline including new seat lockers & cushions, screed & tile floor, tidy crew accommodation area, remove propellers & fit new, refill hydraulics, paint deck markings, load test MOB recovery arm.