Cesca SY 4

Project Time: Approximately 4 Weeks

The Cesca was brought to Mallaig to have a full keel and few planks replaced after the boat had been infested with worm damage.

The boat was raised on stilts to gain access to the keel, once raised the old keel was removed and a new one was cut, shaped and fitted into place. Before lowering the boat back down, the keel was bolted into place. The various planks that had been damaged were replaced; all of the seams were caulked and filled.

Upon hardening the excess filler was sanded off and the Cesca was fully painted and finally returned to sea.